Neighbourhood Planning - Burton Overy Neighbourhood Plan Review 2025 (material modifications)

Record details

Current Neighbourhood Plan Stage Neighbourhood Plan 'made'
Adopted Neighbourhood Plan

Read the adopted Burton Overy  Neighbourhood Plan - FInal 'made' Version 7 October 2025 

Further information and the Burton Overy Neighbourhood Plan evidence base can be found here

Neighbourhood Plan Review

The Burton Overy Neighbourhood Plan is being reviewed by Burton Overy Parish Council.

The presubmission consultation runs from 22nd January 2025 and closes on 5 th March 2025. A copy of the Draft Neighbourhood Plan Review and supporting documents can be viewed at https://www.burtonoverypc.gov.uk/neighbourhood-plan 

Strategic Environmental Assessment

In December 2024 Burton Overy Parish Council requested that the Council undertake a screening assessment fo the review plan for requirement for a SEA.

The screening assessment concluded that a full SEA was not required and the screening was sent to the statutory consultees for comment. The consultees concurred with the Council view and the determination of the Council was issued in May 2025

Read the evidence submitted for the SEA screening

Referendum

A referendum was not required to 'make' the review plan.

Examination

Submission of Plan 

The following documents were submitted by the Qualifying Body for examination in May 2025.

The Qualifying Body has submitted their statement fo modifications and consider that the review plan requires examination but not referendum as the modifications are material but do not change the nature of the plan.

Other documents submitted 

The Council has considered the modifications to the Burton Overy Neighbourhood Plan and has provided the following statement of modifications. The Council agrees that the modifications are material but do not change the nature of the Plan. The Examiner will be provided with all documentation.

Regulation 16 Consultation

After authorisation by the Director for Planning and the Portfolio Holder for Planning under delegated authority ( Part 3, Section C(1) of the Scheme of Officer Delegations, Annexe A of the Constitution. The Neighbourhood Planning Scheme of Delegation – approved by Cabinet on 5 October 2020) the Regulation 16 Consultation is schedueld to commence on 2 July 2025 until 13 August 2025 (6 weeks)

Examiner Appointment

With the agreement of the Qualifying Body, Harborough District Council has appointed Tim Jones of No5 Chambers to undertake the Independent Examination.
 
All documents and representations were submitted to Mr Jones at the end of the Regulation 16 consultation period.
 
Examination
 
The examiners report was received on 5 September 2025.  The reort concludes that the Council should 'make ' the Plan with the recommended modifications.and that a referendum was not required.
 
The Coucnil must 'make' the Plan within 5 weeks of receipt of the Examiners Report. The Qualifying Body are considered the examiners report week commencing 15 September 2025 and confirmed they wishe to procedd to 'making' the Plan.

 

Approval of Neighbourhood Area

Burton Overy Parish Council, as the relevant body, applied for the designation of the Burton Overy Neighbourhood Area. The application was published for a six week period ending on  27 July 2015 and was approved by the Portfolio Holder for Planning Services on 31 July 2015. View a map identifying the designated Burton Overy Neighbourhood Area (PDF, 6.2MB).